I was recently asked to do a presentation of the University’s Blackboard upgrade project and inspired by Andrew Park and Cognitive Media’s brilliant videos for the RSAnimate series. For those of you who haven’t seen their work here are a few of my favourites.
Anyway, I didn’t have time to do a slick stop frame animation of the drawing process but I did produce three sheets of cartoons explaining What is a VLE system?, Why are we upgrading? and Key Phases of the Project.
This cartoon illustrates what a VLE system is for the uninitiated.
In the centre is the view that many academic staff have of Blackboard and other VLE systems – as a bucket full of stuff (video, lecture notes, presentations, images, audio clips) that can be made available to students. VLE software such as Blackboard is much more sophisticated than that, it includes tools which allow tests and surveys to be built and deployed, e-submission of assessments, the collation and management of grade information and tools for creating reports and checking on individual student progress (in Blackboard these are known as The Performance Dashboard and the Early Warning System). Blackboard also receives data from the student records system (Banner) and library reading list information (LaSU).
A more technical view of the components of a typical VLE can be found at http://www.macs.hw.ac.uk/studentwiki/images/1/12/Diavle4.jpg
One of the parts of the Blackboard system that is underused – but many in the ADU are most interested in – are the communication tools such as Chat, Discussion Boards, Wikis, Blogs and Blackboard building blocks such as the Eluminate (now known as Blackboard Collaborate) virtual classroom system. These tools allow collaboration between students and between staff and students.
Why are we upgrading?
This cartoon illustrates the main reasons why we are upgrading from Blackboard 8.2 Academic Suite to Blackboard 9.1 Learn.
Support
First, the version of Blackboard that we currently use (Blackboard Academic Suite 8.2) has been on ‘operational support’ since October 2010 this means that there is no active maintenance from Blackboard to sort corrections, enhancements, bug fixes, Application Packs and Services Packs. This release will no longer be supported at all from October 2012. We need to move to the new version to ensure continued support and updates.
Technical
As part of the Universities IT transformation project, much of the infrastructure that supports the applications that we use (SAP, Banner, and Blackboard) has been upgraded to more reliable and current hardware and software.
Improved functionality
Blogs, wikis and Journals are now a core part of the Blackboard system rather than an additional bought in building block – it means that we can retire the current Learning Objects Blogs and wikis eventually (cost saving)
There have been a number of improvements to the Grade Centre including anonymous grading, grading of blogs, wikis and journals for individuals and groups, a rubrics feature, question by question grading and improvements to the Grade Centre smart views feature allowing instructors to visualize the grade centre in ways that are more manageable to them.
There are now more ways to create and manage groups – Instructors can create sets of related Groups and manually enroll users or randomly distribute all Students amongst the Groups. Each group can now have its own area which can be customized by its members.
The new Mashup integrations with popular services such as You Tube, Slideshare and Flickr allow Instructors and Students to discover, select, and embed content from those services without ever leaving the Blackboard Learn interface. This provides a seamless, easy-to-use experience that does not require the user to jump between Blackboard Learn and other sites or to have any particular knowledge about or comfort with HTML codes.
Efficiency
Blackboard have analysed a lot of common tasks and have reduced number of click and page loads (22% less clicks – 38% less page loads). They have introduced, what they describe as an improved workflow through changes to the way the software works, including drag and drop interface for reordering content, the Control Panel available at all times, Action buttons /Menus, Context Menus and in-line receipts – so the user doesn’t have to confirm once an action has been performed
Key Phases of the Project
This cartoon illustrates the two main parts of the project from an ADU perspective and some of the challenges that we face along the way. The training component of both pilot and roll-out phases has been designed with 3 phases training, testing and enhancement.
Training – designed to get staff up to speed with the new system regardless of their current knowledge, highlighting the features of the system and how they can help support teaching.
Review – where staff check over current Blackboard modules to make sure that they look and operate as expected in the new system.
Enhancement – working to build on your existing modules using some of the new features.










